Skip to content
GitLab
  • Menu
Projects Groups Snippets
  • Help
    • Help
    • Support
    • Community forum
    • Submit feedback
    • Contribute to GitLab
  • Sign in / Register
  • emulab-devel emulab-devel
  • Project information
    • Project information
    • Activity
    • Labels
    • Members
  • Repository
    • Repository
    • Files
    • Commits
    • Branches
    • Tags
    • Contributors
    • Graph
    • Compare
  • Issues 160
    • Issues 160
    • List
    • Boards
    • Service Desk
    • Milestones
  • Merge requests 6
    • Merge requests 6
  • Deployments
    • Deployments
    • Releases
  • Monitor
    • Monitor
    • Incidents
  • Analytics
    • Analytics
    • Value stream
    • Repository
  • Wiki
    • Wiki
  • Activity
  • Graph
  • Create a new issue
  • Commits
  • Issue Boards
Collapse sidebar
  • emulab
  • emulab-develemulab-devel
  • Merge requests
  • !21

HP 5406r Integration with the gpo-ig rack

  • Review changes

  • Download
  • Email patches
  • Plain diff
Open Ali Sydney requested to merge asydney/emulab-devel:hp5406r-integration-v1 into master Jan 09, 2017
  • Overview 1
  • Commits 4
  • Changes 4

The three committed files allow the integration of the HP5406r switch with the IG rack. The following tests were successfully completed:

  1. VLAN and OF provisioning between two bare metal nodes connected to the rack (via the snmpit calls at the boss node).
  2. VLAN and OF provisioning between two bare metal nodes connected to the rack (via the AM API, i.e. using rspecs)
  3. VLAN and OF provisioning between two VMs at gpo-ig and utc-ig (via the AM API, i.e. using rspecs)

Furthermore, the following two attached MIBs will be required. Please place these in the mib path (/usr/local/share/snmp/mibs).HP-ICF-OID-v1.txtHP-SWITCH-CONFIG.txt

Assignee
Assign to
Reviewer
Request review from
Time tracking
Source branch: hp5406r-integration-v1