Move Mothership control node to new racks
Move control.emulab.net over to the d430 racks so that we can connect both boss and ops with 10G to Dell control switches. Mike has a dual 10G Intel card to stick in (replacing the Mellanox card) and can come up with the necessary DAC cables. The center rack has two different UPSes, so plug in control to both. Need to figure out what to do for console access. Probably configure iLO and make it available.