Commit 7ee2bd69 authored by Mike Hibler's avatar Mike Hibler

Add Clemson Phase 2 6420 nodes.

parent 1c44ad2f
......@@ -158,9 +158,9 @@
@section[#:tag "cloudlab-clemson"]{CloudLab Clemson}
The CloudLab cluster at Clemson University has been built
partnership with Dell. The cluster so far has 186
servers with a total of 4,400 cores, 596TB of disk space, and
48TB of RAM. All nodes have 10GB Ethernet and QDR
partnership with Dell. The cluster so far has 260
servers with a total of 6,736 cores, 1,272TB of disk space, and
73TB of RAM. All nodes have 10GB Ethernet and most have QDR
Infiniband. It is located in Clemson, South Carolina.
More technical details can be found at @url[(@apturl "hardware.php#clemson")]
......@@ -233,6 +233,21 @@
with full bisection bandwidth.
}
]
Phase two added 18 Dell C6420 chassis each with four dual-socket Skylake-based
servers. Each of the 72 servers has 32 cores for a total of 2304 cores.
@(nodetype "c6420" 72 "Intel Skylake, 32 core, 2 disk"
(list "CPU" "Two Sixteen-core Intel Xeon Gold 6142 CPUs at 2.6 GHz")
(list "RAM" "384GB ECC GB DDR4-2666 Memory")
(list "Disk" "Two Seagate 1TB 7200 RPM 6G SATA HDs")
(list "NIC" "Dual-port Intel X710 10Gbe NIC")
)
Each server is connected via a 1Gbps control link (Dell D3048 switches) and a
10Gbps experimental link (Dell S5048 switches).
These Phase II machines do not include Infiniband.
}
@section[#:tag "apt-cluster"]{Apt Cluster}
......
Markdown is supported
0% or
You are about to add 0 people to the discussion. Proceed with caution.
Finish editing this message first!
Please register or to comment