- 27 Sep, 2018 4 commits
-
-
Leigh B Stoller authored
the cord, these routes break contact with the Mothership
-
Leigh B Stoller authored
-
Leigh B Stoller authored
-
Leigh B Stoller authored
-
- 26 Sep, 2018 4 commits
-
-
Leigh B Stoller authored
-
Leigh B Stoller authored
-
Leigh B Stoller authored
-
Leigh B Stoller authored
-
- 25 Sep, 2018 1 commit
-
-
David Johnson authored
-
- 24 Sep, 2018 1 commit
-
-
David Johnson authored
When IsFeasible processes the list of events (i.e. reservation start/end, expt start/end), it processes them in sorted order of event time, but if times are equal, there is no secondary sort, and thus the additive (incoming) reservation might be processed before the reductive (outgoing) reservation), which would create a false negative hole in the forecast. This commit adds the secondary sort.
-
- 21 Sep, 2018 4 commits
-
-
Leigh B Stoller authored
-
Leigh B Stoller authored
with cause and optionally freeze the user. "Cause" means you can paste in a block of text that is emailed to the user.
-
Leigh B Stoller authored
This is actually implemented in a backend perl script, so you can do the seach from the command line, but that would be silly, right?
-
Leigh B Stoller authored
defined in portal_defs/portal_maintsite. This closes issue #449.
-
- 19 Sep, 2018 4 commits
-
-
Leigh B Stoller authored
Portal resource availability page. Mothership only.
-
Leigh B Stoller authored
wrong.
-
Leigh B Stoller authored
-
Leigh B Stoller authored
-
- 17 Sep, 2018 6 commits
-
-
Leigh B Stoller authored
-
Leigh B Stoller authored
there are no nodes allocated (transient situation).
-
Leigh B Stoller authored
Portal and MAINSITE and if its the local cluster. Basically, try not to skip node types for some cases that they are wanted.
-
Leigh B Stoller authored
-
Leigh B Stoller authored
-
Leigh B Stoller authored
-
- 14 Sep, 2018 2 commits
-
-
Leigh B Stoller authored
-
Leigh B Stoller authored
-
- 12 Sep, 2018 4 commits
-
-
Leigh B Stoller authored
-
Leigh B Stoller authored
-
Leigh B Stoller authored
an error in some situations. Also increase limit on XEN core from 4 to 12.
-
Leigh B Stoller authored
infinite loop when the topology has a disconnect (in the wire table). Print an error message when we detect that we will not finish.
-
- 11 Sep, 2018 1 commit
-
-
David Johnson authored
-
- 06 Sep, 2018 1 commit
-
-
Leigh B Stoller authored
-
- 05 Sep, 2018 2 commits
-
-
David Johnson authored
(This would enable automatic ipod module rebuilds on kernel installation.)
-
Mike Hibler authored
-
- 04 Sep, 2018 6 commits
-
-
Leigh B Stoller authored
-
Kirk Webb authored
-
Leigh B Stoller authored
-
Leigh B Stoller authored
-
Leigh B Stoller authored
-
Leigh B Stoller authored
and a spinner while waiting.
-