-
Timothy Stack authored
Some power-by-mail hacking: - Bump the timeout for waiting for the operators to flip the switch to 20 minutes. - Fail fast if the node is in hwdown. This case is intended to make an os_load fail for a robot-mounted mote whose robot is in hwdown. - Fail if the robotlab is not open since noone is around to do anything about it anyways. - Assume success if the event state for a node was updated "recently." This is a fall back in case the powertime web page isn't used to notify the system that the node was powered on/cycled. Also, do not send the SHUTDOWN event in this case. - Add a TBNodeEventStateUpdated() function to libdb.pm that returns true if the eventstate for a node was updated within N seconds from the current time.
da5e8604