Updated to reflect hardware recieved, etc.

parent 0cd19cc4
......@@ -11,29 +11,29 @@ Temp. worker co-ordination: Mac
***** Hardware
**********************************************************************
ISP110s:
Status: Ordered, 30 recived
Next shipment: 14, afternoon 8/13 or morning 8/14
Status: Ordered, 44 recived
Next shipment: ??
Responsible: Rob
Note: Rails are currently backordered, should be in next week
Network cables:
Status: Ordered
First shipment: Friday, 8/10
First shipment: Most should come Monday, 8/13
Responsible: Mac
Rackmount nuts/screws:
Status: Ordered
Shipped: ??
Responsible: Mac or Leigh
Will ship: Friday, 8/10
Responsible: Mac
3ft Power cables from ValCom:
Status: Ordered
Shipped: With next ISPs
Shipped: By Monday (8/13)
Responsible: Rob
Short power cables from Standard:
Status: Ordered
Shipped: ??
Status: Ordered, recived 60 1.5ft cables
Next shipment: Remainder of order (36 2ft. cables) 8/15 or 8/16
Responsible: Rob or Leigh
Additional RPCs:
......@@ -49,8 +49,7 @@ Cyclades:
Status: Recieved
Responsible: ??
Note: One host adapter installed in plastic, expanders need to be
hooked up. The other needs to be installed in the serial
server
hooked up. The other is installed in the serial server.
Labels:
Avery labels for cables - pick them up at OfficeMax, etc.
......@@ -60,6 +59,12 @@ Cable ties:
Pick them up at Home Depot
Responsible: Mike
Cable management bars:
Simple horizontal metal bars to tie cables to
Responsible: Mac
Note: Corey suggests that the metal shop is the simplest way to go,
but they may take a week to deiver
**********************************************************************
***** Testbed Software
**********************************************************************
......@@ -78,6 +83,7 @@ power:
Disk image:
Build a disk image that has any changes required for ISPs
Responsible: Rob
Note: Control interface may be differnt - anything else?
**********************************************************************
***** Problems to resolve
......@@ -90,6 +96,10 @@ Decide on machine numbering scheme:
Responsible: ??
Start at pc42?
Serial server:
What machines can we use the Cyclades card in?
Responsible: ??
**********************************************************************
***** Misc
**********************************************************************
......@@ -101,6 +111,11 @@ PC labels:
Responsible: Rob
Note: Will depend somewhat on our chosen numbering scheme
Power outlets:
We need 2 outlets of at least 15 amps per rack
Responsible: Rob
Note: Talk to Corey Hatch
**********************************************************************
***** Testbed state to update
**********************************************************************
......@@ -210,13 +225,14 @@ Wiring: (Note: Mac has a file with some additional tips)
***** Schedule
**********************************************************************
To get the first rack set up, we need:
44 ISPs w/ rails
44 ISPs w/ rails (arrived, not yet installed)
At least 1/3 of the network/serial cables
At least 1/3 of the power cables
At least 1/3 of the power cables (enough have arrived)
'power' that can talk to RPCs
Working disk image
Automation tools
2 power outlets (we should have them now)
2 power outlets (we have them already)
Machine/cable labels
The second rack requires:
44 more ISPs
......
Markdown is supported