Commit 0ad05bef authored by Robert Ricci's avatar Robert Ricci
Browse files

Added another node to the RMA list, and updated state to reflect that the

second rack is essentially done.
parent 2a6818e0
......@@ -14,7 +14,7 @@ ISP110s:
Status: Received
Responsible: Rob
RMAs: 1 returned, replacement recieved
To be RMA'ed: pc83 (NMI errors)
To be RMA'ed: pc83 (NMI errors) pc48 (simply dead, though it worked at first)
Network cables:
Status: Received
......@@ -38,8 +38,8 @@ Additional RPCs:
Additional APCs:
Status: Not ordered
Responsible: ??
Note: We need 2 more 8-port controllers to handle 128 machines +
serial server + cyclades. Can steal from the sharks for now
Note: We've stolen 1 APC from the sharks, which will need to be
replaced if we decide to reconnect them
Cyclades:
Status: Recieved
......@@ -79,17 +79,17 @@ snmpit:
tip/capture:
Get it working over the network and on multiple serial servers
Responsible: Leigh
Status: Done?
Status: Done
power:
Extend it to talk to RPC (serial) power controllers
Responsible: Mac
Status: Done?
Status: Done
Disk image:
Build a disk image that has any changes required for ISPs
Responsible: Rob
Status: Nearly done (waiting for imagezip fixes)
Status: Done
**********************************************************************
***** Problems to resolve
......@@ -148,45 +148,45 @@ New machine type:
Wires table:
Using a consistent wiring scheme, this can be filled by a script
Responsible: Rob
Status: Script created/checked in, first rack done
Status: Script created/checked in, first two racks done
Interfaces table:
Toughest part here is the MAC addresses - See "MAC Address gathering"
procedure below
Responsible: Rob
Status: First rack done
Status: First two racks done
Nodes table:
The only information in this table this is unique per-node is node_id,
ip, and precedence - should be easy to populate with a script
Responsible: Rob
Status: First rack done
Status: First two racks done
dhcpd.conf:
There's already a script (db/dhcpd_makeconf) to generate this once
the nodes and interfaces tables are populated
Responsible: Rob
Status: First rack done
Status: First two racks done
Outlets table:
Using a consistent wiring scheme, this can be filled by a script
Responsible: Rob
Status: First rack done
Status: First two racks done
DNS zone files on paper:
Need to add DNS entries for all new nodes
Responsible: Mac/Rob
Status: First rack done
Status: First two racks done
Information about the RPCs:
Will probably need entires in the nodes table
Responsible: Mac
Status: First rack done
Status: First two racks done
tip/capture state:
Not sure what needs to be done for the new tip/capture
Responsible: Leigh
Status: First rack done
Status: First two racks done
**********************************************************************
***** Procedures
......
Supports Markdown
0% or .
You are about to add 0 people to the discussion. Proceed with caution.
Finish editing this message first!
Please register or to comment